ELECTRICAL & INSTRUMENTATION PIPELINE TECHNICIAN
|
|
SUBJECT AREA
- Basic
Safety
- Electrical
Theory & General Knowledge
- Actuator/Operator
Adjustment (19.5)
- Inspect,
Test, and Calibrate Pressure Switches and Transmitters (25)
- Verify
or Set Protection Parameters for Programmable Controllers and/or
Other Instrumentation Control Loops (26)
- Test
Overfill Protective Devices (30)
- Inspect
and Calibrate Overfill Protective Devices (31)
- CPM
Leak Detection (44)
- Maintain Fixed Gas Detection Equipment (55)
|
Back
to Menu
|
MECHANICAL PIPELINE TECHNICIAN
|
|
SUBJECT AREA
- Basic
Safety
- Basic
Math
- Introduction
to Hand Tools
- Introduction
to Power Tools
- Introduction
to Blueprints
- Basic
Rigging
- Valve
Maintenance (19.1)(19.2)(19.3)(19.4)
- Repair
Valves (21.2)(21.3)
- Inspect,
Test, and Calibrate Tank Relief Valves (22)
- Maintain
and Repair Relief Valves and Pressure Limiting Devices (23)
- Inspect
Valves (20)
- Inspect,
Test, and Calibrate Pressure Limiting Devices (24)
- Troubleshoot
and Repair Pneumatic Valve Actuators and Control Systems (19.6)(21.1)
- Troubleshoot
and Repair Hydraulic Valve Actuators and Control Systems (19.7)(21.4)
- Troubleshoot
and Repair Electric Valve Actuators and Control Systems (19.5)(21.5)
|
Back
to Menu
|
MOBILE CRANE(Available
Now)
|
|
SUBJECT AREA
-
Basic Principles of Cranes
-
Rigging Practices
-
Crane Safety
-
Operating a Crane
-
Communication
-
Preventive Maintenance
-
Load Charts
-
Computer Aids
-
Load Dynamics
-
Site Conditions and Set Up
|
Back
to Menu
|
NON DESTRUCTIVE TESTING(Available
Now)
|
|
SUBJECT AREA
-
Basic Radiographic Principles
-
Radiation Safety
-
Exposure Techniques
-
Film Processing
-
API Requirements (API 1104 Section 8)
-
Radiographic Evaluation and Interpetation
|
Back
to Menu
|
CORROSION PREVENTION FIELD TECHNICIAN 1 - MEASUREMENT
|
|
SUBJECT AREA
- Measure
Structure-to-soil Potentials (1.1)
- Inspect and Perform Electrical Test of Bonds and Isolation
Devices (1.4) (1.5)
- Obtain a Voltage and Current Output Reading from a Rectifier
(3.1)
- Check for Proper Operations of a Rectifier (3.2)
- Measure Pit Depth with a Pit Gauge (8.1)
- Measure Wall thickness with a Handheld Ultrasonic Meter
(8.2)
- Measure Corroded Area (8.3) Monitor Probe (on-line) (10.2)
- Perform Internal Corrosion Remediation (11)
|
Back
to Menu
|
CORROSION PREVENTION FIELD TECHNICIAN 1
- INSTALLATION
|
|
SUBJECT AREA
- Inspect and Verify Test Lead Continuity (2.1)
- Repair Damaged Test Leads (2.2)
- Install Test Leads by Exothermic and Non-exothermic Welding
Methods (2.3) (2.4)
- Inspect for Physical Damage on Buried or Submerged Pipe
(5.1)
- Inspect for External Corrosion on Buried or Submerged Pipe
(5.2)
- Inspect the Condition of External Coating on Buried or Submerged
Pipe (5.3)
- Prepare Surface for Atmospheric Coating (7.2) (7.3) (7.4)
- Apply Atmospheric Coating (7.5) (7.6) (7.7)
- Repair Shorted Casings (9.5)
- Insert and Remove Coupons (10.1)
- Inspect Internal Pipe Surfaces (12)
- Prepare Surface for Coating using Hand and Power Tools (13.1)
- Perform Water Pressure Cleaning (13.2)
- Prepare Surface for Coating by Abrasive Blasting (13.3)
- Apply Coating using Hand Application Methods (13.4)
- Apply Coatings using Spray Applications (13.5)
|
Back
to Menu
|
CORROSION PREVENTION FIELD TECHNICIAN 2
|
|
SUBJECT AREA
- Test
to Detect Interference (1.3)
- Conduct
Close Interval Survey (1.2)
- Check
for Proper Operation of a Rectifier (3.2)
- Troubleshoot
Rectifier Bond Connections (4.1)
- Repair
or Replace Defective Rectifier Components (4.2)
- Inspect
for External Corrosion on Buried or Submerged Pipe (5.2)
- Inspect
the Condition of External Coating on Buried or Submerged Pipe (5.3)
- Visual
Inspection of Atmospheric Coating (7.1)
- Install
Galvanic Anodes (9.2)
|
Back
to Menu
|
CORROSION PREVENTION FIELD TECHNICIAN 3
|
|
SUBJECT AREA
- Adjustment
of Rectifier (4.3)
- Install
Bonds (9.1)
- Install
Rectifiers (9.3)
- Install
Impressed Current Groundbeds (9.4)
|
Back
to Menu
|
Field and Control Operations Technician
(FCCOT)
|
|
SUBJECT AREA
- 60105-02 Start-up of a Pipeline (43.1)
- 65106-02
- 60105-02 Shutdown of a Pipeline (43.2)
- 65106-02
- 60106-02 Monitor pressures, flows, communications and line
integrity, maintain
- 65106-02 within allowable limits (43.3)
- 60105-02 Manually or remotely open or close valves or other
equipment (43.4)
- 65106-02
|
| |
Back
to Menu
|
ABNORMAL OPERATING CONDITIONS - GENERAL
PIPELINE
|
|
SUBJECT AREA
- Abnormal
Operating Conditions (General)
|
Back
to Menu
|
ABNORMAL OPERATING CONDITIONS - CONTROL
CENTER
|
|
SUBJECT AREA
- Abnormal
Operating Conditions (Control)
|
Back to Menu
|
PIPELINE MAINTENANCE TECHNICIAN Version
3
|
|
SUBJECT AREA
- Prepare
Surface and Apply Atmospheric Coatings (7.2)(7.3)(7.4)
- Apply
and Repair External Coating on Buried or Submerged Pipe (13)
- Repair
Shorted Casings (9.5)
- Place
and Maintain Line Markers (14)
- Provide
Security for Pipeline Facilities (28)
- Provide
Temporary Marking of Buried Pipeline Prior to Excavation (17)
- Backfilling
a Trench (39)
- Inspect
Conditions of Right of Way (15)
- Inspect
Navigable Waterway Crossings (16)
- Inspect
Breakout Tanks (27)
- Inspect
Valves (20)
- Inspection
Activities for Tie-Ins, Pipe Replacements or other Components
Connecting to an Existing Pipeline (38)
- Inspection
Following Excavation Activities and Leak Survey after Blasting
(18)
- Conduct
Pressure Test (41)
- Inspect
Existing Pipe following Movement (34)
- Measure
Clearance from Existing Pipe to Underground Structures Installed
by Excavation, Boring, and Directional Drilling (35)
- Launching/Receiving
In-Line Inspection Device (29)
- Install
or Repair Support Structures on Existing Above Ground Components
(37)
- Perform
General Pipeline Repair Activities (40)
- Moving
In-Service Pipe (33)
- Maintenance
Welding on Pipelines (42)
- Abandoning,
Safe Disconnect, Purging and Sealing of Pipeline Facilities (36)
|
Back to
Menu
Back
to Menu
|
GAS PIPELINE OPERATION
|
|
SUBJECT AREA
-
Start-up of a Pipeline (43.1)(43.4)
-
Shutdown of a Pipeline (43.2)(43.4)
-
Monitor Pressures, Flow Communications and Line Integrity and Maintain them within Allowable Limits (43.3)
-
Purge Gas from a Pipeline (50)
-
Purge Air from a Pipeline (51)
-
Test Remote Control Shutdown Devices (54)
-
Perform Incremental Pressure Increases to Uprate MAOP (56)
-
Operate Odorant Equipment (57)
-
Monitor Odorant Level (58)
|
Back
to Menu
Back
to Menu
|